The following are the tasks done during 2018 Q1.
1. Development of a 2-D CAD drawing of the Ranmasu Uyana site & surrounding with the combination of several manual drawings (this to be further developed to a 3-D model in future with a software like Revit or SolidWorks.)
2. Getting the official letters with the IESL president’s endorsement to the relevant authorities to get the necessary permissions & approvals
3. Preparation & coordination work related to the next site visit to get the measurements, levels of the location with a site survey in the selected areas of the site
4. Further studies on the literature survey on the engineering aspects of the design of the ancient micro water management systems in Sri Lanka
The BSESC Heritage Exploration team is led by Eng. Priyan Bellana & Eng. Suran Fernando.
|